Pages in Hüppe+Partner

../images/architecture/2005/hegel/thumbs/01.jpg
Hegelallee ..
../images/architecture/2004/cad/thumbs/04.jpg
Renders usi..
../images/architecture/2004/seidel/thumbs/01.jpg
Residential..
../images/architecture/2003/theater/thumbs/01.jpg
Theaterwall..
../images/architecture/2003/l-geb/thumbs/01.jpg
Johann-Leps..
../images/architecture/2002/student/thumbs/01.jpg
Student Ap.
../images/architecture/2002/guk8/thumbs/01.jpg
Garde Ulane..
../images/architecture/2001/muehlenhof/thumbs/01.jpg
Muehlenhof ..
../images/architecture/1999/karuschen/thumbs/02.jpg
Karuschenwe..
../images/architecture/1999/innovata/thumbs/01.jpg
Innovata Of..
../images/architecture/1997/kirsch/thumbs/01.jpg
Kirschallee..
../images/architecture/1997/treuhand/thumbs/01.jpg
Accountant'..
../images/architecture/1997/guk2/thumbs/01.jpg
G.U.K. 2-5

Innovata Office Building

The building where Hüppe+Partner had its office located on the first floor.

The building had been built in several stages and styles and needed another extension. I designed a final solution although only the top floor of one wing has been built so far.

I did the design, detailing and documentation.

Content:

Completed Top Floor

CAD Render

Blue prints

Completed Top Floor

The top level had to be constructed while the existing office still had buisiness as usual.

The timber framework construction was prefabricated and errected in a few days. The new roof then was sealed within a week. We did precaution for rain but luckily there was no rain in during week.

Everything was finished within 2 months.

Hüppe und Partner

image
The walls are covered with aluminium panels and framed with zink metal profiles.

Note that the gutter is a bit inside the roof and not visible from the outside.

image

CAD Render

A render using our CAD software to demonstrate how the building would look like when two stages would have been completed.

image

Blue prints

I decided that it would be better to show all details in 1-20 scale. This is the cut.

Detail D-01 (235 kb pdf)

image
A section of the ground floor showing most of the details needed.

Detail D-02 (230 kb pdf)

image
The main stairway needed to be extended to the new floor. I would have prefered are more generous solution but the budget didn't allow more.

Detail D-05 (200 kb pdf)

image
Top of page